| DOE-STD-1029-92
Appendix B
SOP-618-4
Revision 0
Approved October 22, 1991
Page 14 of 16
6
PLUG WELDING (continued)
NOTE
Weld should have uniform runout of weld flash and no evidence of
cracking in weld runout. Plug should be visually perpendicular
to the reservoir.
[30]
Visually inspect weld for acceptability.
IF the weld appears acceptable,
[a]
THEN mark "YES" in the "Visual Inspection Acceptable"
column of the Check Sheet/Data Sheet
[b]
IF the weld appears unacceptable,
THEN mark "NO" in the "Visual Inspection Acceptable"
column of the Check Sheet/Data Sheet
[31]
IF this is the first reservoir of the day,
OR the first reservoir after an electrode change,
OR the first reservoir after a fixture change,
THEN contact Health Physicist to check for off-gassing from plug.
Health Physicist:
[a]
Verify the off-gassing rate from the reservoir plug is less than
1.0x10-5 microcuries per cc of air.
[b]
IF the Health Physicist identifies that a reservoir exceeds the
off-gassing rate limit,
THEN STOP this procedure,
AND Contact supervisor immediately.