05/15/92
1415
Maintenance reported completion of work on Building 202 fire main.
1428
Cleared tagout TO-92-098 for Building 202 fire main and began
post-maintenance testing; Senior Mechanic William Jones monitored
testing for maintenance.
1445
Building 202 fire main post-maintenance testing completed
satisfactorily; fire main placed in service; fire watch cancelled.
1530
Inspected Building 202 fire main; no problems noted.
3
1559
Relieved by John A. Smith. Tim Anderson
4
05/15/92
1559
Assumed shift. John A. Smith
1600-2400
Plant status as above.
C Shift
1635
Rotated process supply water pumps. Status: Pump 1 - Standby,
Pump 2 - On-line, Pump 3 - Standby.
1655
Noticed potential safety problem outside south entrance to Building
205. Runoff has eroded ground beside walk. Roped off area and
informed Shift Supervisor. Completed work request WR-1038-92 to
have hole filled.
6
1715
Relieved by Janet Black. John A. Smith
1715
Assumed the shift. Janet Black
1805
Process Control operator requested 500 gallons of de-ionized (DI) water.
Notified Shift Supervisor and aligned DI Unit 2 to supply water to
process.
1850
Relieved by John A Smith. Janet Black
1850
Assumed shift. John A Smith
1910
Process Control operator reported delivery of 500 gallons DI water
completed. Informed Shift Supervisor. DI Unit 3 JAS 05/15/92 Unit 2 is
7
due for regeneration during midnight shift.
2125
Informed by Shift Supervisor of National Weather Service severe
thunderstorm watch in effect until 2230.
2130
Checked that all doors and windows are secured in Building 202 and 204