Page Title: Example Log Entries
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1035-93
42
8
05/15/92
2220
Packing leakage on process supply water Pump 2 is out-of-specification
per round sheet. Leakage rate is approximately 3-5 gallons per minute
(gpm), specification is 1 gpm. Cause appears to be packing failure.
Notified Shift Supervisor and placed Pump 3 on-line. Took Pump 2 out
of service and placed caution tag C-087-92. Pump 2 status is now
Emergency Use Only.
9
2252
Reviewed log. James Campbell, Shift Supervisor.
10
Incorrect
2254
Maintenance reported work completed on process cooling water Pump 3.
data, See
2315
Cleared caution tag C-087-92 and installed tagout TO-92-105 for process
05/16/92,
supply water Pump 2.
11
0045. TD. 2345
LATE ENTRY: 2225 Wrote Work Request WR-1039-92 for process
supply water Pump 2 and delivered to Shift Supervisor.
05/16/92
0003
Relieved by Tony Diaz. John A. Smith
12
05/16/92
0003
Assumed shift. Tony Diaz
0000-0800
Process Facility status: Normal operation; Water plant status: Operational
B Shift
Process cooling water (PCW) system:
Pump 1 - Tagged out
Pump 2 - On line
Pump 3 - Tagged out
Process supply water (PSW) system;
Pump 1 - Standby
Pump 2 - Tagged out
Pump 3 - On line
Incomplete tasks: 05/15/92, 1910 - Regenerate DI Unit 2
13
0045
Incorrect entry identified. Entry of 05/15/92, 2254, states that
Maintenance reported completion of work on PCW Pump 3. Work is still
in progress on PCW Pump 3. Entry should read: "work completed on PCW
Pump 1," as confirmed by Shift Supervisor.
0120
Started regeneration of Deionizer Unit 2.
0240
Maintenance reported completion of packing gland adjustment on PSW
Pump 2. Verified that packing leakage is now 1 gpm.
0255
Cleared tagout TO-92-105. Psw Pump 2 status is now Standby.
A-4