Click here to make tpub.com your Home Page

Page Title: Field Element
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-XXXX-2005
06/30/2005
229.
FIELD ELEMENT. A non-Headquarters DOE organization that is geographically
distinct. Field elements can be area offices, support offices, operations offices, field
offices; regional offices, or offices located at environmental restoration, construction, or
termination sites.
230.
FIELD ELEMENT. A DOE field-based office that is responsible for the management,
coordination, and administration of operations at a DOE facility. [10 CFR 708.2]
231.
FIELD OFFICE MANAGER (FOM). A DOE individual with management
responsibility for a field/Operations organization. The FOM is responsible for the
management, coordination, and administration of operations under his or her purview and
reports to the cognizant Program Secretarial Officer(s) (PSO) through the appropriate
program office(s). For the purpose of this Order, a Field Project Manager who reports
directly to a PSO and is responsible for the management, coordination, and
administration of operations under his purview, is considered an FOM. (This definition
also applies to other self-supporting DOE offices, such as the Rocky Flats Office,
Superconducting Super Collider Project Office, and Strategic Petroleum Reserve Project
Office which reports directly to a PSO.) [DOE O 5480.29] [EH62dd1]
232.
FIELD PROGRAM MANAGER (FPM). A DOE senior official who is responsible for
the onsite management and supervision of DOE staff and facilities. This official also
provides guidance to contractors and oversees their activities. The FPM reports to the
field/Operations office and is accountable to the appropriate Secretarial Officer, as
defined in management agreements. [EH62dd1]
FIELD VALIDATION. Process of providing reasonable assurance that design
233.
requirements are properly reflected in the physical plant and in the associated
documentation. Field validation tests the strength of the bonds in the basic configuration
management model (i.e., between design requirements, the physical configuration, and
the configuration documentation). [EH62dd1]
234.
FILING. Except as otherwise specifically indicated, the completion of providing a
document to the Office of the Docketing Clerk and serving the document on the person to
whom the document is addressed. [10 CFR 820.2]
235.
FINAL NOTICE OF VIOLATION. A document issued by the Director in which the
Director determines that the respondent has violated or is continuing to violate a DOE
Nuclear Safety Requirement and includes:
(i)
A statement specifying the DOE Nuclear Safety Requirement to which the
violation relates;
39
DRAFT


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business