06/30/2005
range to envelop the conditions of the accidents. (See Continuous Air Monitoring,
Monitoring, Performance Monitoring, Personal Monitoring, Personnel Monitoring,
Primary Environmental Monitors, Safety Class Monitoring Equipment, and Secondary
Environmental Monitors) [EH62dd1]
463.
POST-MAINTENANCE TEST. Applicable and appropriate testing performed following
maintenance to verify that a particular structure, system, and component, piece of
equipment, or process performs its intended function based on its design criteria and that
the original deficiency has been corrected and no new deficiencies created. In some
cases, the extent of a particular postmaintenance test may extend beyond the component
or piece of equipment that has been repaired, replaced or modified to complete systems
or processes, depending on the type of maintenance action performed and the affect that
the component or piece of equipment has on the total system or process. [DOE G 433.1-
1]
464.
POWER PLANT EXPERIENCE. Experience acquired in the testing, operation, or
maintenance of power generating facilities. Experience in design and construction may
be considered applicable power plant experience and should be evaluated on a case-by-
case basis. [DOE O 5480.20A]
465.
PREDICTIVE MAINTENANCE. Predictive maintenance consists of the actions
necessary to monitor, find trends, and analyze parameters, properties and performance
characteristics or signatures associated with structures, systems, and components (SSCs),
facilities or pieces of equipment to discern whether or not a state or condition may be
approaching which is indicative of deteriorating performance or impending failure, where
the intended function of the SSCs, facilities or pieces of equipment may be compromised.
Predictive maintenance activities involve continuous or periodic monitoring and
diagnosis in order to forecast component degradation so that "as-needed" planned
maintenance can be initiated prior to failure. Not all SSC, facility or equipment
conditions and failure modes can be monitored and diagnosed in advance; therefore,
predictive maintenance should be selectively applied. To the extent that predictive
maintenance can be relied on without large uncertainties, it is normally preferable to
activities such as periodic internal inspection or equipment overhauls. [DOE G 433.1-1]
466.
PRELIMINARY DOCUMENTED SAFETY ANALYSIS. Documentation prepared in
connection with the design and construction of a new DOE nuclear facility or a major
modification to a DOE nuclear facility that provides a reasonable basis for the
preliminary conclusion that the nuclear facility can be operated safely through the
consideration of factors such as
A. The nuclear safety design criteria to be satisfied;
76