B. A safety analysis that derives aspects of design that are necessary to satisfy the
nuclear safety design criteria; and
C. An initial listing of the safety management programs that must be developed to
address operational safety considerations.
(See Final Safety Analysis Report, Preliminary Safety Analysis Report, Safety Analysis
Report, Safety Basis, Safety Evaluation, and Safety Evaluation Report) [10 CFR 830.3]
467.
PRELIMINARY NOTICE OF VIOLATION. A document issued by the Director in
which the Director sets forth the preliminary conclusions that the respondent has violated
or is continuing to violate a DOE Nuclear Safety Requirement and includes:
(i)
A statement specifying the DOE Nuclear Safety Requirement to which the
violation relates;
(ii)
A concise statement of the basis for alleging the violation;
(iii)
Any proposed remedy, including the amount of any proposed civil penalty; and
(iv)
A statement explaining the reasoning behind any proposed remedy.
[10 CFR 820.2]
468.
PRELIMINARY SAFETY ANALYSIS REPORT (PSAR). The safety analysis report
submitted to and approved by DOE prior to the procurement of materials or components,
construction, and preoperational testing of a facility which has the potential in its
intended use to be a Category 1, 2, or 3 hazard nuclear facility. (See Final Safety
Analysis Report, Preliminary Documented Safety Analysis, Safety Analysis Report,
Safety Basis, Safety Evaluation, and Safety Evaluation Report)
PRESIDING OFFICER. The Administrative Law Judge designated to be in charge of an
469.
enforcement adjudication who shall conduct a fair and impartial hearing, assure that the
facts are fully elicited, adjudicate all issues, avoid delay, and shall have authority to:
(i)
Conduct an adjudicatory hearing under 10 CFR 820;
(ii)
Rule upon motions, requests, and offers of proof, dispose of procedural requests,
and issue all necessary orders;