Click here to make tpub.com your Home Page

Page Title: [Battery racks] [Battery cabinets]
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-SPEC-3019-96
ATTENTION:
Delete paragraph 3.3.4 if the services of the Seller as listed in paragraph 1.3 do not require the installation of a
rack.
********************
3.3.4
[Battery racks.] [Battery cabinets.]
ATTENTION:
Enter the desired type and number of tiers. This selection may depend on space available, but should not exceed
two tiers. Step tiers are preferable for ease of maintenance, provided space is available. The maximum
acceptable height of the racks shall be 50 inches (1.2 m) from the floor to the top of the battery jar located on the
second tier. For racks greater than 50 inches (1.2 m) in height, contact the local authority having jurisdiction, as
these become a problem for the following reasons:
Difficult and unsafe to maintain
Temperature differences between cells
Seismic integrity
********************
a. Provide [battery racks] [self-contained cabinets] made of steel, properly
insulated and coated in accordance with paragraph 3.6.1. The paint shall
resist the corrosive effects of the battery electrolyte, resistant to 93% sulfuric
acid in immersion duty. The [racks] [cabinets] shall be of the [2-tier] [2-step]
] type, complete with all necessary steel frames, fittings, rails and
[
braces, plastic insulating channels, plastic spacers and hardware. [Provide
earthquake-rated hardware.]
b. The [racks] [cabinets] shall permit battery mounting in the rooms shown on
] [Drawing No.
] (Attachment 1) and shall permit easy
[Sketch No.
battery maintenance. Provide a minimum of 14 inches (350 mm) clearance
from the top of the battery-jar terminal posts to the bottom of the [rack]
[cabinet] above.
c. Each [rack] [cabinet] shall have a ground-loop connection point and a lead-
plated ground terminal lug from Seller's standard manufacturer for the
Owner's ground conductor.
ATTENTION:
Select the following paragraph d. if ordering battery cabinet and if the room in which the battery cabinet will be
located does not have adequate cooling.
********************
d. The battery cabinet shall be equipped with a nonferrous, nonsparking fan
system capable of providing the proper number of air changes per hour and
limit the hydrogen concentration to less than 25% LEL (lower explosive limit).
All fan components shall be grounded for spark resistance.
e. Where [racks] [cabinets] are shipped unassembled, number or match-mark
all parts to facilitate field assembly and provide installation instructions.
ATTENTION:
Include the following paragraph if applicable.
********************
12


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business