| DOE-SPEC-3019-96
b. The Owner's general review of drawings and data or waiver of same shall in no event
relieve Seller of any responsibility to meet all requirements of this specification or the
purchase order.
a. Drawings showing batteries, interconnections, [rack] [cabinet] outlines, dimensions
required for mounting, weight of [racks] [cabinets] and filled cells, and description of
[rack] [cabinet] finish for each battery system
b. Cell outline including connector and battery terminal details, electrolyte levels, weight
of assembled cell, separate weights of electrolyte, plates, and jar
ATTENTION:
Add the following paragraph when seismic requirements apply.
********************
c. Seismic rack design and certification (see paragraph 3.2.7)
d. Type, catalog designation, and description of major components provided by Seller
e. Longest recommended storage time when batteries are shipped charged, and Seller's
storage and freshening charge recommendations
f.
Field test recommendations, including performance tests
g. Test reports for factory tests, including capacity tests
within the time limits, as set forth in the purchase order, instruction manuals in accordance
with the Owner's requirements. One copy of the instructions applicable to each
component or group of components, if there are no differences, shall be shipped with the
component(s).
SELLER'S
SPEC
SUBMITTAL
OWNER'S REVIEW
ITEM
DESCRIPTION
PARA
DATE
REQUIRED BEFORE
SHIPMENT
a.
Preliminary drawings &
App. A
With proposal
Yes
data sufficient for
Owner to evaluate
equipment
b.
Completed data forms
App. B
With proposal
Yes
17
|