Click here to make tpub.com your Home Page

Page Title: Equipment marking
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-SPEC-3019-96
ATTENTION:
Include optional method of marking, if desired.
********************
3.7.1
Nameplate. Provide a corrosion-resistant nameplate with clearly legible writing
for each jar, in an easily visible place. It shall provide all necessary information
pertaining to the equipment but, as a minimum, include the following:
manufacturer's name, type of battery cell, manufacturer's type designation,
nominal electrolyte specific gravity at 77F (25C) and date of manufacture.
[Alternately, the date of manufacture may be stamped on one of the jar posts.]
Polarity markings. For each battery cell, the positive posts shall be marked
3.7.2
either with a positive sign (+) or letters "POS." Negative posts shall carry a
negative sign (-) or the letters "NEG."
ATTENTION:
Where applicable, include the following paragraph and enter the seismic zone number for the battery installation.
********************
3.7.3
Seismic qualification marking. Mark each rack "Zone [
]."
ATTENTION:
Revise scope of field services as appropriate, depending on who does the installation.
********************
Installation. The [Owner will] [Seller shall] install the batteries. [Provide the services of a
field-service representative to provide technical advice for installation and startup. Scope
of services shall be clearly stated in Seller's proposal in accordance with Appendix A.]
Provide adequate information covering installation requirements in time for Owner's use
(see paragraph 4.4).
ATTENTION:
Include the following paragraph if an annual maintenance contract is required. Coordinate with Appendix A
requirements.
********************
Maintenance. Submit with the proposal a quotation for the annual maintenance of each
battery string. Include details of the maintenance work, testing and record-keeping
performed as a part of the maintenance contract. Submit with the proposal a typical
example of a maintenance report for a similar maintenance contract.
a. Submit the drawings and data required by the specification and/or listed in
paragraph 4.2 within the time specified for Owner's review.
16


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business