|
| B.
Regulatory Guide
1.20, "Comprehensive Vibration
Assessment Program for Reactor Internals During Preoperational
and Initial Startup Testing."
C.
Regulatory
Guide
1.30, "Quality Assurance
Requirements for the Installation, Inspection, and Testing of
Instrumentation and Electric Equipment."
D.
Regulatory
Guide
1.37, "Quality Assurance
Requirements for Cleaning of Fluid Systems and Associated Com-
ponents of Water-Cooled Nuclear Power Plants."
E.
Regulatory Guide 1.41, "Preoperational Testing of
Redundant Onsite Electric Power Systems to Verify Proper Load
Group Assignments."
F.
Regulatory
Guide
1.52 "Design, Testing, and
Maintenance Criteria for Post-Accident Engineered-Safety-Feature
Atmosphere Cleanup System Air Filtration and Adsorption Units of
Light-Water-Cooled Nuclear Power Plants."
G.
Regulatory
Guide
1.56,
"Maintenance of Water
Purity in Boiling Water Reactors."
H.
Regulatory Guide 1.68, "Initial Test Programs for
Water-Cooled Nuclear Power Plants."
I.
Regulatory Guide 1.68.1, "Preoperational and Ini-
tial Startup Testing of Feedwater and Condensate Systems for
Boiling Water Reactor Power Plants."
J.
Regulatory Guide
1.68.2, "Initial Startup Test
Program to Demonstrate Remote Shutdown Capability for Water-
Cooled Nuclear Power Plants."
K.
Regulatory Guide 1.68.3, "Preoperational Testing
of Instrument and Control Air Systems."
(Supersedes Regulatory
Guide 1.80, "Preoperational Testing of Instrument Air Systems.")
L.
Regulatory Guide
1.72, "Spray Pond Piping Made
From Fiberglass-Reinforced Thermosetting Resin."
M.
Regulatory Guide 1.79, "Preoperational Testing of
Emergency Core Cooling Systems for Pressurized Water Reactors."
N.
Regulatory Guide
1.95, "Protection of Nuclear
Power Plant Control Room Operators Against an Accidental Chlorine
Release."
O.
Regulatory
Guide
1.108, "Periodic Testing of
Diesel Generator Units Used as Onsite Electric Power Systems at
Nuclear Power Plants."
14-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |