Click here to make tpub.com your Home Page

Page Title: Power Plant Area Practical Factors Card
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



POWER PLANT AREA PRACTICAL FACTORS CARD
NAME: _____________________________________________________________
INSTRUCTIONS: The trainee must perform, simulate, or observe (as required and indicated by the X's) all practical
factors listed on this card. Activities indicating a single NPPO action may not be changed: activities indicating more than
one NPPO action (perform, simulate, observe) may be satisfied by completing any one. The order of preference for the
actions shall be (1) perform, (2) simulate, (3) observe.
Upon satisfactory completion of each activity, a qualified operator shall circle the action taken, and sign (using full
signature) and date in the appropriate place.
S
P
i
O
e
m
b
r
u
s
f
l
e
o
a
r
r
t
v
FUNCTIONAL LOGS
m
e
e
Signature
Date
Complete Log 1-A (Section 3)
X
Complete Log 1-A (Section 10)
X
Complete Log 1-D
XX
Complete Log 7-B
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
FEEDWATER AND CONDENSATE SYSTEMS
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Fill the hotwell and condensate system (including No. 2
feedwater heater)
XX
Fill yard lines
XX
Recirc. yard lines
X
Fill the steam drum with SUFWP
X
Line up to fill steam drum with MFP's
X
Line up to fill steam drum with ECP
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
COOLING-WATER SYSTEMS
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Start up condenser cooling-water system
XX
Route CCW to tower basin using local operators
XX
Drain main cooling-tower basin
XX
Cross-connect cooling-water systems
X
Reset main cooling-tower-fan vibration switch
XX
Put steam on cooling-tower basin
XX
Drain main cooling-tower risers
XX
Monitor and control basin level
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
MAIN STEAM SYSTEM
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Draw vacuum on main condenser
X
Warm up main steam header
X
Warm up turbine chest
X
Place auxiliary steam cross-connect in service
X
Shift gland seal to main steam
X
Blow down superheaters during standby
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TURBINE GENERATOR
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Start up oil system on turbine generator and test
X
Test overspeed trip of turbine generator
X
Shift and inspect L.O. strainers
X
Start up turbine generator
X
B-6


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business