Route generator H, to atmosphere
X
Route generator H, to casing
X
Purge generator with CO,
XX
Reset auto transfer scheme
X
Parallel turbine generator with INEL loop
X
Place both LO coolers in service
XX
Fill generator with H,
XX
Place turbine generator on turning gear
X
Shift and replace hydrogen bottles
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
POWER-PLANT EVOLUTIONS
Plant heat up
XX
Plant cool down
XX
Start up power plant from hot standby to full power
X
Shut down power plant from power to hot standby
X
Cool down and drain steam, feed, and condensate systems
XX
Recover from loss of normal power
XX
Perform monthly running equipment switchover
X
Place a sight glass in service
X
Chemical analysis of all water chemistry
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
LOG READINGS
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Take six sets of power-plant log readings: Three sets must
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
be 0030 readings (midshift), and one set (0030) readings on
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Monday (midshift).
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
No. 1 - 0030 (midshift)
X
No. 2 - 0030 (midshift)
X
No. 3 - 0030 (midshift)
X
No. 4 - 0030 Monday, (midshift)
X
No. 5
X
No. 6
X
I hereby verify that the named individual has satisfactorily completed all power-plant-area practical factors and has
demonstrated the necessary abilities and maturity to perform the indicated activities.
_______________________________________________________________
Alternate Reactor Shift Supervisor
Date
B-7
|