| DOE-STD-1053-93
e)
Fasteners and locking devices are properly installed; proper torque values
are determined and used where appropriate.
f)
Internal conditions are
acceptable
before
closeout
of
large
equipment/components.
g)
Postmaintenance tests are completed satisfactorily (see "Guidelines to
Good Practices f or Postm aintenance T esting at DOE N uclear Facilities").
3.4.2.4
Planners and engineers should exercise sound judgment and a good
understanding of plant management practices to select work controls that
contribute to work quality without unnecessarily restricting workers. The
following guidance applies:
a)
Prior to release for work, maintenance work packages should be
reviewed by a qualified maintenance engineer. The maintenance
engineer should ensure that work instructions are clear and correct;
appropriate work controls, inspection points, and performance tests have
been specified; proper materials are available; and the work is ready to
proceed.
b)
Preventive maintenance conducted on equipment under this program
should be performed in accordance with "Guidelines to Good Practices
f or T y pes of M aintenance at DOE N uclear Facilities" and approved plant
procedures, and should include all manufacturer or vendor recommended
maintenance unless otherwise authorized by the maintenance manager.
Preventive maintenance intervals should be adjusted as needed, based on
maintenance history, to minimize failures of operating equipment.
c)
Measuring and test equipment used in this program should be controlled
and calibrated as required by "Guidelines to Good Practices f or Control
and Calibration of M easuring and T est Equipm ent (M &T E) at DOE
N uclear Facilities.
13
|