|
| DOE-STD-1055-93
A work sampling program should be used to establish and update baseline effectiveness
values and to assess the impact of imposed constraints and limitations such as radiation
contamination control and historical repair time versus engineered time standards to provide
for productivity improvements.
Maintenance workmanship standards used to gauge and ensure an appropriate level of
performance are those consensus standards associated with specific maintenance activities
such as:
National Electric Code
Asbestos Abatement Standards
OSHA regulations
National Standards for Calibration and Certification
Garage (vehicle) repair/service standards
Warranty/guarantee stipulations
FCC telecommunications regulations
Davis-Bacon Act
Waste Stream Management
ALARA Contamination Control
Plant housekeeping standards
Environmental regulations
A Real-Property Cost Collection System (using a series of blanket work orders for each
building) may be used to assist in identifying cost drivers associated with Plant buildings and
structures.
Programmatic maintenance support should be identified by accounting work orders
associated with specific programmatic activity.
Current cost drivers which usurp maintenance resources normally allocated to facility
maintenance and production/process equipment tasks include:
Safety Class Items
OSHA and environmental compliance
Various upgrades
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |