| 
 | ||||||||||
| 
 |  DOE-STD-1077-94  12.1.1 Cover Page. The Cover Page contains the following elements: a. The document's name; b. The submitting contractor; c. The name of the facility; and d. Spaces for the signatures and dates of the submitting training manager, the approving facility line management, the approving Operations Office manager, and the approving cognizant Secretarial Office.  12.1.2 Table of Contents. The Table of Contents includes sufficient detail to allow the reader to locate specific elements of the document, with notations of related attachments.  12.1.3 Definitions. The Definitions section contains those terms used in the document which are not likely to be familiar to people outside of the facility.  12.1.4 Abstract. The Abstract contains two sections: A brief description of the facility, its hazard classification, its mission (past, a. present, and future), and purpose; and b. A brief overview that identifies development efforts necessary to comply with the objectives and criteria for all programs being accredited.  12.1.5 Introduction. The Introduction includes an explanation of the document's intent. It lists all reference materials and outlines any special considerations relative to the programs submitted.  12.1.6 Application. The Application section contains a listing of all the job positions at the facility that are included in each of the seven training programs listed in Section 6 of this Standard. For those positions that the facility management wants to except from the accreditation process, a description of the rationale (justification) is provided. The guidance for excepting positions is found in this Section 6 of this Standard. 42 | 
| 
 Privacy Statement - Press Release - Copyright Information. - Contact Us |