Click here to make tpub.com your Home Page

Page Title: Department of Energy Technical Standard DOE-STD-1073-93
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1159-2003
d.
Explain the purpose and content of a Master Equipment List.
e.
Describe the procedure development, verification, and validation process.
f.
Explain the purpose of maintaining good facility condition and housekeeping.
g.
Conduct a facility observation walk through and identify deficiencies often found with
respect to Material, Housekeeping, Industrial Safety, and Radiological areas.
h.
Describe configuration control and its relationship to the maintenance work control
process and the maintenance history file.
i.
Explain facility management's role in facility maintenance.
j.
Describe the purpose and scope of the Maintenance Implementation Plan.
k.
Identify the types of data and records required to be retained as permanent records.
12. Waste management personnel shall demonstrate a familiarity level knowledge of
Department of Energy Technical Standard DOE-STD-1073-93, Guide for Operational
Configuration Management Program.
Supporting Knowledge and/or Skills
a.
Describe the purpose and objectives of the Operational Configuration Management
Program.
b.
Discuss what constitutes acceptable contractor compliance consistent with the
requirements of DOE-STD-1073-93, Guide for Operational Configuration
Management Program, for the following elements of the contractor's Configuration
Management Plan:
Program planning
Equipment scope criteria
Concepts and terminology
Databases
Procedures
c.
Discuss the following elements of the Configuration Management Program:
Design requirements
Document control
Change control
Assessments
Design reconstitution adjunct
Material condition and aging adjunct
d.
Discuss the purpose, concepts, and general process for applying the graded
approach to operational configuration management.
e.
Identify the types of data and records required to be retained as permanent records.
12


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business