Click here to make tpub.com your Home Page

Page Title: General Technical
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-S T D-1180-2004
e. Define and discuss the following terms associated with control points:
Benchmark
Back-site
Temporary benchmark
Turning point
Departures
Instrument height
3.
Construction Management personnel shall demonstrate a working level
knowledge of the principles and construction methods associated with grading,
paving, and drainage for site preparation.
Supporting Knowledge and/or Skills
a. Read and interpret a site plan drawing.
b. Read and interpret a contour map.
c. From a site plan show how quantities of earth required for fill or removal were derived.
d. Discuss field and lab soil compaction methodologies and utilization criteria.
e. Define the following terms as they relate to horizontal curves:
Point of intersection (PI)
Point of tangency (PT)
Point of curvature (PC)
f.
Discuss the characteristics of rigid and flexible pavement.
g. Discuss the hydraulics associated with drainage to include:
Open channel flow
Flood zone determination
h. Discuss the following elements of hydrostatics related to site preparation:
Hydrostatic pressure
Flood routing
Hydraulic gradient
Seepage
6


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business