Discuss the construction methods and requirements associated with earth work and
trenching. Include the following elements in the discussion:
Water pollution and soil erosion
Noise pollution
Traffic control measures
Dust control
Personnel Protection
4.
Construction Management personnel shall demonstrate a working level
knowledge of techniques for preparing cost estimates.
Supporting Knowledge and/or Skills
a. Discuss how each of the following factors contributes to the development of cost
estimates for a construction project:
Construction plans
Productivity rates
Specifications
Crew composition
Schedule interpretation and impacts
General and administrative rates
Material prices
Equipment types and rates
Known labor rates
b. Discuss the impact of job factors on productivity rates.
c. Evaluate time, material, and labor estimates for a construction project.
d. Discuss the effect of escalation and inflation factors on cost estimates.
e. Discuss the purpose of contingency in cost estimating, including an explanation of
how it is calculated.
f.
Prepare a cost and technical analysis of a contractor's proposal.
g. Discuss funding authorization limits and their impact on the cost estimating process.
h. Develop recommendations for the contracting officer based on cost and technical
analysis.
i.
Describe the application and use of estimator tools.