|
| DOE-S T D-1180-2004
24.
Construction Management personnel shall demonstrate a familiarity level
knowledge of mechanical system/component installation.
Supporting Knowledge and/or Skills
a. Discuss the following elements and components of mechanical system piping design.
Include a discussion of construction methods used in the installation of each
component:
Pipe hangers
Piping supports
Snubbers
Piping insulation and vapor barriers
Piping installation
Piping anchors
Piping material
Field routing of piping
Expansion joints
b. Discuss the following types of piping connections and their application to different
piping sizes and uses:
Threaded connections
Flanged connections
Socket welded connections
Butt welded connections
Re-weldable joints
Bayonet joints
Compression joints
c. Describe the basic construction methods and precautions associated with the
installation of the following types of mechanical components:
Large pumps
Heat exchangers
Air conditioning units
Tanks and pressure vessels
25.
Construction Management personnel shall demonstrate a familiarity level
knowledge of the systems for industrial waste treatment, storm drains, and
sanitary waste treatment.
Supporting Knowledge and/or Skills
a. Describe the basic design for a sanitary waste treatment system.
b. Discuss the following methods of waste water treatment:
Primary
Secondary
Tertiary
17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |