Click here to make tpub.com your Home Page

Page Title: Battery and Charger Check - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-3003-2000
8)
Correct the hydrometer reading for level and temperature and enter on Data
Sheet 1 as specific gravity.
____
9)
Measure and record the electrolyte level (as found) for each cell. Read from
the bottom of the electrolyte High Level line.
Above line: Add;
Below line: Subtract.
Completed by ____________________________________ Date_______
/
(signature)
(print name)
10)
Inspector shall verify the values obtained in Steps C.8 and C.9.
Verified by ______________________________________ Date_______
/
(signature)
(print name)
11)
If any cell's electrolyte level is below the Low level mark, add distilled water
to those cells to the High level mark, and place on equalize charge per
Battery Equalize Procedure immediately after completion of this procedure.
____
12)
Measure and record the electrolyte level (as left) for each cell. Read from
the bottom of the electrolyte High Level line.
Above line: Add;
Below line: Subtract.
Completed by ____________________________________ Date_______
/
(signature)
(print name)
13)
Inspector shall verify that the Acceptance Criterion in Step C.12 was met.
Verified by ______________________________________ Date_______
/
(signature)
(print name)
Section C completed by ______________________________________________
/
(signature)
(print name)
Date/Time Completed ____________________________ a.m./p.m.
/
:
28


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business