Click here to make tpub.com your Home Page

Page Title: Procedure
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-3003-2000
12)
For safety reasons, a person shall not work alone. At least two persons (Two Man Rule)
must always be present when working on electrical power systems.
PROCEDURE
A. PREPARATION
CHECK
1)
Read the following PROCESS SIGNIFICANCE statement:
Statement of battery function and significance ....
____
2)
Check to ensure that this is the latest approved revision of this procedure.
____
3)
Confirm each Instrument has a current calibration sticker and record the
information in the Instrument/Tool Report (No._____) attached to this
procedure and in the TOOLS/INSTRUMENTS/ MATERIALS Section of this
procedure.
____
4)
Obtain an authorized Work Request (No._____) and record the number on
Page 1 and Data Sheet 1 of this procedure.
____
5)
Obtain an approved Work Clearance Permit (No._____) per Site Safety
Manual.
____
6)
Confirm that the Battery Room ventilation system is operating.
____
7)
Confirm with Operations that the battery has been on normal float voltage
(XXX-XXX Vdc) for at least 72 hours since the conclusion of the last
equalization charge and subsequent return to float voltage. If not on float
charge, notify (Operations and Electrical) supervision.
____
Section A completed by ______________________________________________
/
(signature)
(print name)
Date/Time Completed ____________________________ a.m./p.m.
/
:
25


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business