- The complexity of the activity: The size and complexity of the facility and/or process being reviewed
will drive the size and complexity of the ORR. The depth of the review will require that reviewers be
able to comprehend and accomplish the criteria provided them. The number of criteria developed is
based on the size and complexity of the facility/process.
- A new process or facility versus the restart of an existing activity: A significantly new process would
involve verification of training and qualification of workers and new procedures without any significant
reference points available onsite. This would drive the ORR to be more thorough and comprehensive
than the review for a process that has a significant experience base onsite.
- The programmatic significance of the subsequent operations: A facility/process that is intended for
long-term programmatic operations would necessarily require a more comprehensive and thorough
review in some specific area than would a temporary operation.
- Introduction of new hazards: The proposed facility evolution (startup or restart) must be evaluated
for potential new hazards. While some new hazards will be obvious, a critical review is needed to
identify subtle new hazards introduced by the startup of new facilities or modification of existing
facilities. Modifications made to improve operations in one aspect may unexpectedly introduce
hazards in a different area.
- Increase in existing hazards or risk: Modifications to the facility, personnel, or procedures must be
evaluated for their potential to increase the hazard level (e.g., by increasing the inventories of
hazardous materials) or the hazard potential (e.g., by introducing a new mechanism for the release of
hazardous materials).
- Operating history of the facility: The record of operational reliability, e.g., reliability during most
recent operation, may identify issues to be addressed in the proposed ORR. Additionally, the nature of
the facility/process transition to standby or shutdown status needs to be considered. A shutdown
resulting from systemic safety concerns may require greater ORR depth than would a shutdown in