| ![]() DOE-STD-3006-95
Appendix 4
were out of calibration. The contractor maintains that they do not have to calibrate them per the
SAR. We disagree.
Finding Designation:
This section defines whether the finding is a prestart or post-start finding. The ORR Team Leader in
consultation with the Inspector and Senior Advisers, if applicable, will make this determination using the criteria
specified in the ORR plan-of-action.