|
| DOE-STD-3020-97
6.0
QUALITY ASSURANCE
6.1
Manufacturer's Quality Assurance Program, Procedures, and
Documentation
Filters shall be manufactured and shipped under a quality assurance
program meeting the essential requirements of ASME NQA-1.
Procurement and fabrication activities shall allow positive identification of the
grades of source materials used in construction, and permit positive
identification of the roll (or production run for separatorless filters) of filter
medium used in the completed filter. All tests and inspections shall be
conducted in accordance with documented manufacturer's procedures, and
the results shall be traceable to specific lots of completed filters. The results
of penetration and resistance tests specified in Section 6.2 of this standard
shall be documented and identified by serial number for each individual filter
unit. Nonconformances with the above items and documentation of
problems and their resolution shall be addressed in the manufacturer's QA
Plan.
Qualification. Filter manufacturers shall be required to show
6.1.1
evidence that HEPA filters meet the test requirements of Sections
6.1.3 to 6.1.5 of this standard.
Qualifications testing must be performed and certified by an
independent test laboratory.
Requalification is required every five years.
If a filter fails any or all of the qualifications tests, the test organization
shall first notify the manufacturer, and provide the manufacturer the
opportunity to review test methods and results prior, to removing the
filter model from the QPL. (or similar qualifications list) and issuing
notice thereof.
16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |