Click here to make tpub.com your Home Page

Page Title: Document Review - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-EM-STD-5505-96
General employee and radiological protection personnel training records
Occurrence reports
Logs documenting radiological control activities
It is beneficial to review the Radiation Protection Program since it will be the primary governing
document for radiological control. An assessor will return to this document many times over the
course of the assessment to check on site policies regarding various radiological control activities.
Most document reviews necessary to assess radiological control can be conducted during idle
time between interviews and observations. Generally, documentation of radiological activities
from the past few months should be reviewed. An effective way to conduct the review is to first
verify completeness of a document by determining if all required routine entries have been made
and if abnormal entries have been recorded and appropriately annotated or explained. Next,
determine if the document can be used to accurately reconstruct events. This can be
accomplished by comparing the entries in two or more different logs, records, or surveys for the
same event. Finally, determine if management periodically reviews and documents meaningful
comments for areas needing improvement.
As an illustration of reviewing radiological control records, consider the survey program. Check
the Radiation Protection Plan for the requirements regarding survey periodicity, survey
techniques, and filling out survey records or maps. The requirements in the site-specific manual
should be consistent with the current DOE regulations concerning radiological control. With this
background knowledge in mind, find the survey records and maps for the last few months and
check to see if all required surveys have been completed, maps and logs are filled out correctly,
and any anomalies are fully explained. If any discrepancies are noted on a given survey, look for
the same problem on other surveys. Individual deviations from requirements should be used as a
starting point to look for more widespread programmatic problems.
124


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business