DOE-EM-STD-5505-96
APPENDIX G
SAMPLE OPERATIONS ASSESSMENT REPORT
FINDING:
The required reading books for A and C shifts in the Shift Operations Office had 12 delinquent
items dating from 31 May 1994 to 3 January 1995. Of those 12 items the percentage of personnel
completing the item varied from 0% to 83%. (References: 1, 2)
DISCUSSION: The delinquent required reading items were removed from the required
reading book on 18 July 1995.
FINDING:
There was one open and delinquent item listed in the required reading log. This item was issued
26 April 1995 and the required completion date was 10 May 1995. T Shift is the only group that
has not completed this required reading assignment. (References: 1, 2)
TIMELY ORDERS TO OPERATORS
REFERENCES:
1. DOE 5480.19, Chapter XV
2. CM-4-3, Industrial Safety Manual, Volume 1, G-1
3. IP-0842 Volume 2 Section 4.9.1
FINDING:
Standing Order 95-05, "Lock and Tag" Revision 1 dated June 2, 1995 contradicts section 4.0 of
reference 2. (References: 1, 2, 3) [Concern: 1]
DISCUSSION: The standing order states that zero energy checks will be performed in
advance of hanging tags, and then annotated on block 26 of the Tagout Authorization form.
Reference 2 states that safe condition checks will be performed after the tags have been hung
and verified, then indicated on block 26 of the Tagout Authorization form.
FINDING:
There is no method to verify that personnel read the Standing Orders (Reference: 1)
158