APPENDIX G
SAMPLE OPERATIONS ASSESSMENT REPORT
OPERATIONS PROCEDURES
REFERENCES:
1. DOE 5480.19, Chapter XVI
2. Procedure TO-250-550 Step 4.1
3. IP-0842 Vol V Section 4.1 Para 2.0
4. IP-0842 Vol II Section 5.2
5. IP-0842 Vol II Section 4.10.1
FINDING:
Step 4.1 of the Transfer from R to TK-12 Procedure was conducted and signed by Operations
Engineer vice the Person in Charge (PIC). (References: 1, 2)
FINDING:
No safety precautions, job hazards, or potential abnormal events were discussed at the pre-job
brief for the Transfer from R to TK-12. (References: 1, 3)
FINDING:
Transfer from R to TK-12 Procedure references the wrong revision/change for the transfer from
R Tank Trailer to Tank Farms Procedure. (Reference: 1, 4)
FINDING:
Transfer from R Tank Trailer to Tank Farm Procedure references the wrong revision/change for
the Transfer from R to TK-12. (Reference: 1, 4)
FINDING:
Step 5.1.1 of Transfer from R to TK-21 Procedure requires verification that R to TK-12 Checklist
- Section A located on page 26 has been completed; no checklist is located on page 26.
(Reference: 1, 4)
FINDING:
Transfer from R Rail Car to Tank Farm Procedure does not require that a tank be lined up to
receive the waste as a prerequisite. (Reference: 1, 4)
FINDING:
Transfer from R Rail Car to Tank Farm Procedure Steps 5.5.21 and 5.5.24, and 5.3.18.2 and
5.3.18.3 are out of order. (Reference: 1, 4)
159