Click here to make tpub.com your Home Page

Page Title: Definitions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-3006-2000
2.1.2 DOE Manuals and Handbooks
a.
DOE Manual 251.1-1
b.
DOE Handbook, DOE-HDBK-3012-96, Guide to Good Practices for Operational
Readiness Reviews (ORR), Team Leader's Guide.
2.2 Order of Precedence. In the event of conflict between the text of the document and a DOE
Order or Rule, the DOE Order or Rule takes precedence. This document does not supersede applicable
laws and regulations unless a specified exemption has been approved by the appropriate authority.
3.0 DEFINITIONS
This section provides the meaning intended for the terms and statements used in DOE O 425.1B and this
standard. The description or discussion concerning the terms may be expanded or more specific than
definitions found in other DOE documents. However, use of the terms and statements in this standard
are consistent with definitions provided in other DOE documents.
3.1 Authorization Agreement. A documented basis between the Department of Energy (DOE) and
the contractor for high-hazard facilities (Categories 1 and 2), incorporating the results of DOE's review
of the contractor's proposed authorization basis for a defined scope of work. The Authorization
Agreement contains key terms and conditions (controls and commitments) under which the contractor is
authorized to perform work. Any changes to these terms and conditions would require DOE approval.
3.2 Authorization Basis. Safety documentation supporting the decision to allow a process or facility
to operate. Included are corporate operational environmental requirements as found in regulations and
specific permits, and, for specific activities, work packages or job safety analyses (see safety basis also).
3.3 Breadth. The set of core requirements evaluated by the ORR or RA team during conduct of the
readiness review.
3.4 Conclusion. A discussion of the final judgement of readiness and adequacy for a review area,
which considers the positive (strengths) and negative (findings) elements.
4


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business