DOE-STD-3006-2000
5.0 DETAILED GUIDANCE
5.1 Roles and Requirements for Contractor Operational Readiness Review. Most responsible
contractors have developed procedures to manage the readiness process. This section is intended to
describe the recommended content and attributes of an ORR program and organization. It is anticipated
that most contractors will require only minimum modifications to their procedures to achieve the intent
of this standard and meet the requirements of DOE O 425.1B, Attachment 1, "Contractor Requirements
Document."
5.1.1 Summary of Contractor Operational Readiness Review (ORR) Process. The contractor ORR
shall focus on the readiness of all hardware, personnel, procedures, and compliance with the applicable
requirements.
a. The purpose of the contractor's ORR is to confirm that nuclear facilities being started up or restarted:
C
Are constructed in accordance with the approved design;
C
Can be operated safely;
C
Will be or are operated, maintained, and supported by trained and competent personnel;
C
Are designed and operated in conformance with applicable DOE Orders and regulatory
requirements;
C
Will be or are operated so that no undue risk to employees, the public, or the environment
results; and
C
All of the above items are properly and adequately documented.
b. The foundation for readiness of the nuclear facility is a DOE approved safety basis, approved
environmental documentation, a satisfactory safe working environment, and compliance with DOE
Orders and requirements. The Authorization Agreement may be an effective compilation of
necessary documents. The ORR must confirm that necessary, approved, requirements documentation
is in place and that procedures, personnel, equipment, and systems support the approved
requirements. It is not the responsibility of the ORR to approve the foundation documentation--only
to verify that it is complete, approved, and implemented as required by core requirements of DOE O
425.1B. Critical to a determination of compliance with DOE Orders and other contractual standards
is a robust standards management process at the site and facility. Under most circumstances, the
20