Click here to make tpub.com your Home Page

Page Title: Safety Envelope Verification
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-3006-2000
SAFETY ENVELOPE VERIFICATION (SE)
OBJECTIVE
SE.1 Facility safety documentation is in place that describes the "safety envelope" of the facility. The
safety documentation should characterize the hazards/risks associated with the facility and should identify
mitigating measures (systems, procedures, administrative controls, etc.) that protect workers and the
public from those hazards/risks. A system to maintain control over the design and modification of
facilities and safety-related systems is established. (CORE REQUIREMENT 7)
Criterion
The safety documentation addresses appropriate hazards/risks associated with operations.
Administrative controls are in place to ensure that repairs (or modifications) are adequately
analyzed to identify and to ensure that design changes are documented and approved prior to
implementation. (5480.23, para 8, Attachment 1, section 3 and 4, DOE-STD-1073-93, Ch.1.3,
S/RID FAs 03 and 08)
Approach
Record Review: Review safety basis documentation to assess whether the safety basis adequately
includes appropriate hazards/risks associated with XXX operations. Review recent design
changes and modifications to the facility to ensure that they have been reflected in drawings and
documents available to operators and maintenance personnel.
Interviews: Interview personnel associated with developing/processing facility modifications to
determine if they understand configuration management requirements for the facility.
Shift Performance: Perform a facility walk down to determine that there are no uncontrolled
modifications to safety systems. This walk down should evaluate the accuracy of drawings and
other documentation for plant operation and maintenance. At least one recently completed
modification should be observed and changes verified, including changes to operating procedures
if applicable.
Appendix 4-11


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business