| DOE-TSL-1- 2002
APPENDIX D
CANCELED DOE STANDARDS
DATE
DOCUMENT NO.
TITLE
CANCELED
REASON
NE F 3- 7T
Inspection Requirements for Materials Used
07/96 No longer needed
in Reactor Coolant System Wear
Applications (10/67)
07/96 No longer needed
NE F 3-10T
Nondestructive Examination of Reactor
Core Components (w/Amendments 1 and 2)
(7/80)
07/96 No longer needed
NE F 3-11T
Mass Spectrometer Helium Leak Detection
for Instruments and Small Components
(2/72)
03/89 Replaced by ASQC M1
NE F 3-15T
Requirements for Inspection of Dimensional
(1987)
Characteristics (8/73)
NE F 3-37T
Special Requirements for Metal Products
04/75 No longer needed
(5/74)
NE F 3-39T
Testing of High Temperature Cable for
07/96 No longer needed
Nuclear Detectors (8/71)
NE F 3-40T
Methods for the Analysis of Sodium and
04/84 Replaced by ASTM
Cover Gas (w/Amendments 1 and 2) (11/78)
C997-83
NE F 3-41T
In-Place Testing of HEPA Filter Systems by
07/96 Replaced by ASTM F
the Single-Particle, Particle-Size
1471-93
Spectrometer Method (12/81)
NE F 3-42
Operating Policy of DOE Filter Test Program
05/98 Replaced by DOE-STD-
3022-98
NE F 3-43
Quality Assurance Testing of HEPA Filters
02/99 Replaced by DOE-STD-
3025-99
NE F 3-44
DOE Filter Test Facilities Quality Program
02/99 Replaced by DOE-STD-
Plan
3026-99
NE F 3-45
Specifications for HEPA Filters Used by
02/97 Replaced by DOE-STD-
DOE Contractors
3020-97
NE F 4-20T
Operation and Maintenance Manuals (10/71)
07/96 No longer needed
NE F 5- 1T
Cleaning and Cleanliness Requirements for
07/96 No longer needed
Nuclear Components (1/78)
NE F 5- 9T
Sodium Removal Processes (4/77)
07/96 No longer needed
NE F 5-10T
Decontamination of Hot Leg LMFBR
07/96 No longer needed
Components (2/84)
NE F 6- 2T
Welding of Reactor Core Components and
07/96 No longer needed
Test Assemblies (7/73)
NE F 6- 5T
Welding and Brazing Qualifications
07/96 No longer needed
(Supplement to ASME Boiler and Pressure
Vessel Code, Section IX) (3/83)
07/96 No longer needed
NE F 6- 6T
Welding of Structural Components (AWS
D1.1 with Additional Requirements) (6/73)
NE F 6- 7T
Weldability Tests for Materials (7/71)
04/75 No longer needed
D-15
|