|
| DOE-TSL-1-2007
APPENDIX D
CANCELED DOE STANDARDS
DATE
DOCUMENT
TITLE
CANCELED
REASON
NE E 10- 6T
Tank for Gas Service (w/Amendment 1)
01/79 No longer needed
(1/74)
NE E 10- 7T
Blowdown Suppression Tank (5/72)
07/96 No longer needed
NE E 10- 8T
Steel Containment Vessel (12/73)
07/80 No longer needed
NE E 11- 1T
Ion Exchanger, Non-Regenerative Type
07/96 No longer needed
(5/72)
NE E 11- 2T
Filter for Sodium Service (1/73)
07/80 No longer needed
NE E 12- 4T
Shielded Shipping Cask for Spent
07/96 No longer needed
Reactor Fuel Elements (w/Amendment 1)
NE E 12- 5T
Operating Manuals for Fuel Shipping
07/96 No longer needed
Containers (1/75)
NE E 12- 6T
Ancillary Features of Irradiated Fuel
11/87 Replaced by ANSI
Shipping Casks (1/79)
N14.19-1988
NE E 12- 7T
Inspection and Preventive Maintenance
07/96 No longer needed
of Fuel Shipping Containers (1/75)
NE E 13- 1T
Ceramic Grade Plutonium Dioxide (12/81)
07/96 No longer needed
NE E 13- 2T
Ceramic Grade Uranium Dioxide
07/96 No longer needed
(w/Amendment 1) (1/84)
NE E 13- 3T
Fast Flux Test Facility Uranyl Nitrate
07/96 No longer needed
Solution (6/71)
NE E 13- 4T
Fast Flux Test Facility Plutonium Nitrate
07/96 No longer needed
Solution (6/71)
NE E 13- 5T
Fast Breeder Reactor Fuel Pin (1/84)
07/96 No longer needed
NE E 13- 6T
Fast Breeder Reactor Mixed Oxide Fuel
07/96 No longer needed
Pellet (w/Amendment 1) (1/84)
NE E 13- 7T
Fast Breeder Reactor Uranium Dioxide
07/96 No longer needed
Pellet (1/84)
NE E 13- 8T
Fast Flux Test Facility Driver Fuel Pin
01/82 Replaced by ASTM
Seamless Cladding Tube (6/71)
A771-88
NE E 13- 9T
Fast Flux Test Facility Driver Fuel Pin
01/82 Replaced by
End Caps (6/71)
DOE(NE) M7-23
NE E 13-10T
Fast Flux Test Facility Driver Fuel Pin
01/82 Replaced by ASTM
Reflectors (6/71)
B166-86
NE E 13-11T
Fast Flux Test Facility Driver Fuel Pin
01/82 Replaced by ASTM
Plenum Spacer (6/71)
A269-88
NE E 13-12T
Fast Flux Test Facility Driver Fuel Pin
01/82 Replaced by ASTM
Plenum Spring (6/71)
A313-87
NE E 13-13T
Fast Flux Test Facility Driver Fuel Pin
01/82 Replaced by ASTM
Wrap Wire (6/71)
A580-83
NE E 13-15T
Fuel Assemblies for Pressurized Water
08/82 No longer needed
Reactors (7/71)
D-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |