Click here to make tpub.com your Home Page

Page Title: Appendix D: Canceled DOE Standards - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-TSL-1-2007
APPENDIX D
CANCELED DOE STANDARDS
DATE
DOCUMENT
TITLE
CANCELED
REASON
NE E 13-16T
Fast Breeder Reactor Assembly (1/86)
07/96 No longer needed
NE E 14- 5T
Inflatable Seal--Containment Vessel
01/79 No longer needed
Airlock (6/72)
NE E 14- 6T
Gaskets--Containment Vessel Airlock
01/79 No longer needed
NE E 15- 3T
Insulation/Heater Module-Piping (4/72)
03/75 No longer needed
NE E 15-2NB-T
Class 1 Nuclear Components
07/96 No longer needed
(Supplement to ASME Boiler and Pressure
Vessel Code, Section III, Subsections
NE E 15-2NC-T
Class 2 Nuclear Components
07/96 No longer needed
(Supplement to ASME Boiler and Pressure
Vessel Code, Section III, Subsections
NE E 15-2ND-T
Class 3 Nuclear Components
07/96 No longer needed
(Supplement to ASME Boiler and Pressure
Vessel Code, Section III, Subsections
NCA and ND) (11/81)
NE E 15-2NE-T
Class MC Nuclear Components
07/96 No longer needed
(Supplement to ASME Boiler and Pressure
Vessel Code, Section III, Subsections
NCA and NE) (8/75)
NE E 16- 1T
Test Vehicles for Transient Reactor Test
07/96 No longer needed
Facility (TREAT) Experiments Containing
Sodium (8/74)
NE F 1- 1
Preparation and Application of RDT
07/96 No longer needed
Standards (w/Amendment 1) (6/77)
NE F 1- 2T
Preparation of Plant and System Design
07/96 No longer needed
Description Documents (see conversion
project FACR-0001) (1/89)
NE F 1- 3T
Preparation of Unusual Occurrence
07/96 No longer needed
Reports (w/Amendment 1) (12/77)
NE F 2- 2
Quality Assurance Program
07/96 No longer needed
Requirements (w/Amendments 1-7) (1/82)
NE F 2- 4
Quality Verification Program
07/96 No longer needed
Requirements (1/81)
NE F 2- 6T
Quality and Control of Analytical
07/96 No longer needed
Chemistry Laboratories for Mixed Oxide
Fuel Analysis (3/79)
NE F 2- 7T
Acceptance Sampling Plans (11/73)
07/96 No longer needed
NE F 2- 8T
Qualification and Control of Analytical
07/96 No longer needed
Chemistry Laboratories for Control Rod
Absorber Material Analysis (12/78)
NE F 2- 9T
Reliability Assurance (6/74)
07/96 No longer needed
NE F 2-10
Quality Assurance Program
07/96 No longer needed
Requirements (Supplement to
D-14


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business