|
| DOE-HDBK-1074-95
post-training performance. Questions to consider include:
1.
Will aging equipment or systems contribute to the impact on the facility
if an employee performs improperly?
2.
Will operational transition impact the ability of the employee to perform
properly after training?
3.
Does an operational, shutdown, or standby condition of the facility
impact the ability of the employee to perform properly after training?
Programmatic Mission
This factor addresses the concerns related to the impact training has on
accomplishing the primary mission of the facility. Potential considerations
include:
1.
Does post-training performance impact the facility mission?
2.
Could improper post-training performance cause the facility to lose its
ability to fulfill its mission?
3.
If the facility is scheduled to undergo a "mission transition," what
impacts will the transition have on the post-training performance of the
employee?
Characteristics of the Facility (Complexity)
The term "complexity" refers to the integral operational, maintenance, and
technical support aspects of the facility considered from an engineering,
human factors, and safety perspective. The inter-relationship of these
elements with employee performance is of significant consequence to
technique selection. Considerations include:
1.
After training, will the employee need to apply only basic skills, or will
synthesis and reasoning be required for proper performance?
2.
Are there backup safety systems, system duplicity, or human factors
that impact operator performance or the level of formality and effort
A-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |