| DOE-HDBK-1078-94
EXERCISE PREVIEW--CLASSROOM
Instructor Outline
Trainee Activity
INTRODUCTION
1.
a.
Scenario Title: Primary
(1)
Cooling Operations--Single
(2)
Loop and Natural Circulation
Operations
b.
Expected Duration
(1)
Simulator--2 to 4 h
(2)
Classroom--2 to 4 h
c.
Learning Objectives.
SCENARIO OVERVIEW AND REVIEW
2.
a.
Initial Conditions
(1)
Power (100%)
(2)
Core flow (100%)
(3)
Equilibrium xenon, near EOL
(4)
Maximum decay heat power history.
b.
ECCS Surveillance
(1)
Review Surveillance Proce-
Respond to instructor questions.
dure 7.4.5.17
Note: Use the generic outline
provided in Appendix C
as a reference for topics
to discuss.
(2)
ECCS pump startup failure
(a)
Symptoms (Control Room
Respond to instructor questions.
indications)
140
|