| DOE-HDBK-1078-94
EXERCISE PREVIEW--CLASSROOM (Continued)
Instructor Outline
Trainee Activity
2. SCENARIO OVERVIEW AND REVIEW
(Continued)
(b)
Applicable alarm response
Respond to instructor questions.
procedures (list:)
(c)
ECCS system started
Procedure 2.1.3
(d)
TS LCO 3/4.5.1 action
requirements for inoperable
core cooling pump
Note: Use the generic
outline provided in
Appendix C as a
reference for topics
to discuss while
reviewing TS.
c.
Primary Cooling Pump Seal Failure
Respond to instructor questions:
(1)
Symptoms (Control Room indi-
Leak-detected confinement equip-
cations) (list:)
ment, drain flow high, annunciator
Primary cooling pump outer seal
leakage high
Primary cooling pump seal staging
flow high/low.
(2)
Operator actions
Respond to instructor questions:
Note: Use the generic outline.
(a)
Applicable annunciator
Review Plant procedures (list:)
Procedure 4.3.1.2 (High Uniden-
tified Reactor Leakage)
(b)
Applicable plant abnormal
Review Plant Procedure 4.3.1.3
procedures (list:)
(High Identified Reactor Leakage)
141
|