Click here to make tpub.com your Home Page

Page Title: OJT Setting
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1078-94
SETTING AND CONDITION
REQUIREMENTS
LEARNING OBJECTIVES
OJT Setting:
Given the reactor plant at full power, the
secondary equipment, closed cycle, cooling
Facility operating mode; equipment and
water system running with one heat
equipment status
exchanger in service and one heat exchanger
in standby, and the secondary equipment,
closed cycle, cooling water pump aligned with
one pump running and one pump in standby,
operate the secondary equipment, closed cycle,
cooling system within system temperature limits.
Laboratory Setting:
Given a process sample, laboratory equip-
ment, and reagents, analyze a feedwater sample
Equipment; materials
for pH in accordance with approved procedures.
Given a manual on fire prevention, state the
Classroom Setting:
most effective extinguishing agent for a Class-C
References
fire.
Simulator Setting:
Given a malfunction in the main feedwater
pump, troubleshoot the malfunction in the main
Problem situations or contingencies
feedwater pump.
Workshop Setting:
Given the disassembled parts of a three-phase
electric motor, proper tools, and a technical
Equipment; tools; references
manual, assemble parts of the three-phase
electric motor in correct sequence.
Classroom Setting:
Given a complete set of protective clothing,
don the clothing in the correct sequence.
Safety considerations
98


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business