| DOE-HDBK-1078-94
PREEXERCISE BRIEFING-EXERCISE-POSTEXERCISE CRITIQUE
Instructor Outline
Trainee Activity
SIMULATOR INITIAL CONDITION
1.
SET--IC-11
PREEXERCISE BRIEFING
2.
a.
Scenario Summary (if needed)
b.
Learning Objectives (if needed)
c.
Shift Turnover Information
(1)
No equipment out of service
(2)
No evolutions in progress
(3)
No abnormal equipment lineups
(4)
Planned evolutions--ECCS
surveillance
(5)
Initial plant conditions:
(a)
Power (100%)
(b)
Core Flow (100%)
(c)
Equilibrium xenon
(d)
Maximum decay heat power
history
(e)
Refueling is scheduled for
next month.
d.
Assign Shift Positions
Conduct shift turnover, board
walkdown and assume shift positions
and prepare to perform ECCS
surveillance.
EXERCISE
3.
a.
Start Simulation--RUN
144
|