| DOE-HDBK-1099-96
APPENDIX B - EXAMPLE DRILL SCENARIOS
Title:
Evaporator Feed Tank Header Line Leak
Drill Number:
WEACDC04
Revision Number: 0
2. Use required drill communications, that is, "THIS IS A DRILL," before and after each drill-
related communication over radios or public address systems.
3. Assume the following initial facility conditions: (" " indicates a required initial condition for this
scenario, "*" indicates a distraction to be used at the discretion of the drill coordinator). Note:
For distractor selected, provide crew with appropriate procedure,
*
Rainfall has been very heavy for the past 24 hours
*
Truck filling Caustic Storage Tank.
*
GA-6 monitor testing in progress.
*
Truck filling Acid Storage Tank.
*
Chemical cleaning of filters in progress.
*
Unloading DWPF Tanker.
All other conditions are "as is."
4. Respond to drill conditions AS IF THEY ARE REAL.
DRILL EVENT GUIDE
RESPONSE/EVALUATION CRITERIA
CONDITION
* Denotes critical action step
Initiating CUE:
Drill Controller calls
Operator(s) at the scene:
Control Room to report water leaking from
piping between Feed Tank and Treatment
Building.
Reported spill to control room, including the
following:
Between Feed Tank and building
*
Location of leak/spill.
Contaminated Sump discharge
*
Type of spill.
Source/cause of leak/spill.
CUE: Failed weld at elbow
Wind speed and direction.
CUE: As is
Contaminated personnel.
CUE: Only if self-contaminated
B 6-5
|