DOE-HDBK-1099-96
APPENDIX B - EXAMPLE DRILL SCENARIOS
Title:
Evaporator Feed Tank Header Line Leak
Drill Number:
WEACDC04
Revision Number: 0
Recommendations to stop spill.
Source can be stopped by
NOTE:
completing either of;
*
Spill was stopped at the source.
A: Stop all flow into header: Cleaning
solutions, Evaporator Sump Pumps,
Dike Sump Pumps.
RESPONSE/EVALUATION CRITERIA
CONDITION
Reported immediately when spill has
B: Re-route Header to WWCT.
stopped.
Appropriate protective equipment was
donned.
Warned other personnel away from spill
area.
Barricaded and/or roped off area as needed.
Control Room Operations
Reported spill to Supervision and SRSOC,
including the following:
Between Feed Tank and building
*
Location of leak/spill
Contaminated Sump discharge
*
Type of spill.
CUE: Failed weld at elbow
Source/cause of leak/spill.
Size and estimated amount of spill.
Wind speed and direction.
CUE: As is
Personnel contamination.
CUE: Only if self-contaminated
*
Notified RCO and Industrial Hygiene.
Immediately reported when spill was
stopped.