| 3) Guidance provides for formal
A. For complex situations (such as setting contract-level
BBC.2
disposition of Confirmation Team,
standards) it will be necessary to use relatively rigorous
Stakeholder and DNFSB
methods for confirmation (of acceptance as well as adequacy
comments on the WSS.
and feasibility) of the WSS set. [M-II.3.b.(2)]
B. The Convened Group shall establish the functions and
relationships (e.g. issue management rigor and formality) of
the teams based upon the extent to which relevant
communities are known to hold differing opinions on the issues
under review. [M-II.3.c.(a)]
C. Documentation shall describe how integrity of the SMS is
maintained during the establishment of performance
objectives, performance measures, and commitments. [D-(d)]
C. Work in Teams
1) The Convened Group resolves all
A. An implicit assumption for all WSS sets is that a management
BBC.1, MG.2
issues raised during the Process
system (with clear roles and responsibilities) exists to apply
as a group or by reference to the
the standards. [M-III]
Agreement Parties.
B. The Convened Group members are empowered to represent
the Agreement Parties and designated-affected DOE
organizations. [M-I.2.c]
C. The Convened Group controls refinement of the work definition
(including hazards description and identified standards) during
application of the Process. [M-II.2.(c)]
D. The contractor shall comply with and assist Doe in complying
with all applicable laws and regulations. [D-(f)]
E. The conditions and requirements for operations (including the
WSS set) to be initiated and conducted are agreed-upon
between DOE and the contractor (i.e. Agreement Parties and
their representatives). [D-(b),(7)]
|