Click here to make tpub.com your Home Page

Page Title: Scope and Special Considerations for the Phase II ISMS Verification
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-3027-99
Facility:
Special considerations for review :
XYZ 1 XYZ 1 continues to operate in accordance with an approved SAR. Satisfactory readiness
to conduct operations was verified by an ORR two years ago. Operations since startup
have been satisfactory.
The scope of the review should be limited to evaluating corrective actions for ORR
findings and the adequacy of the self-assessment program specified in ISMS.
XYZ 2 XYZ 2 continues to operate with an approved BIO. Operations at XYZ 2 were
independently evaluated within one year. Periodic EH assessments indicate weakness in
the radiological controls program. Several recent occurrences raise questions about the
adequacy of radiological controls.
The scope of the review should be limited to evaluating corrective actions for the EH
assessment, verifying the adequacy of the self-assessment program, and a reviewing
the radiological controls program within XYZ 2.
XYZ 3 XYZ 3 is in the final stage of construction. A SAR is being prepared. Readiness to
commence operations will be verified by an ORR in the next fiscal year. Construction
safety programs are in accordance with OSHA requirements and project management
programs are in accordance with DOE Order 4700.1, as specified in the ISMS.
Verifying satisfactory implementation of Construction Safety and project
management programs are within the scope of this review. The contractor's self
assessment program should also be evaluated to determine whether it is consistent
with the ISMS.
XYZ 4 All program work within XYZ 4 has been completed. The facility is scheduled for D&D
in two fiscal years. Some spaces within XYZ 4 are in use as office and storage space.
One vault is used to store low level mixed radiological waste in accordance with a site
RCRA Part B permit. A recent sitewide RCRA compliance inspection verified the
implementation of the RCRA permit was satisfactory. Due to the limited inventory of
material, XYZ 4 is a radiological facility. Previous facility representative reports indicate
that radiological controls may be deficient.
The scope of the review should be limited to the fire protection aspects of
housekeeping as well as adequacy of radiological controls within the storage areas.
The self assessment program established by the part time Facility Manager should also
be evaluated.
XYZ 5 XYZ 5 is a low hazard, non-nuclear facility with limited chemical hazards and is being
operated by a sub contractor. All work is controlled in accordance with OSHA
requirements. Your verification efforts should include a review of the responses to a
recent review by my OSHA compliance office and the implementation of ISMS by the sub
contractor.