Click here to make tpub.com your Home Page

Page Title: Approvals and Notifications
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1029-92
3.5.5 Approvals and Notifications
The approvals and notifications section identifies approvals and notifications that must
occur before the actions in the procedure begin. Approvals and notifications related to
specific action steps in the procedure are placed adjacent to the affected action step.
[1]
Provide instructions to ensure that all necessary approvals are obtained and all
required notifications are made before initiating the procedure. Approvals and
notifications may involve responsible individuals such as:
C Shift manager
C Central control room operator of the affected units
C Responsible system or equipment engineer
C Support, quality control, regulatory, and audit personnel
C Health physics and chemistry technicians.
EXAMPLE 3-19. Approval to begin a procedure.
3.3
Approvals
[1]
Consult with, and obtain permission from, your supervisor
before beginning performing this procedure
Supervisor Initials
[2]
If a work package encompassing activities performed in a procedure does not
include instructions to obtain permits before performing the activity, provide
instructions for obtaining the required permits (for example, radiation work or
confined space entry permits).
[3]
Provide for notifications if they are required in the event of a delay.
31


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business