| DOE-STD-1029-92
C Unlocking valves or rooms
C Recording the as-found condition of the structure, system, or component
C Verifying if systems and components are in use before removal from service
(for example, redundant safety system or indicator lights)
C Confirming the correct system or equipment configuration
C Establishing system or equipment alignment and power supply
C Identifying actions to cope with potential hazards such as fire, radioactive
spills, or exposure to radiation
C Installing portable communications equipment and preparing special test
equipment
C Identifying needed support services such as craft personnel to remove a relay
cover.
C Verifying availability of performance documents before continuing with the
procedure.
C Providing specifications and tolerances that determine whether the results of
the prerequisite action steps are acceptable
C Obtaining required permits such as radiation work, electrical work, or confined
space work permits. Ensure appropriate signoffs and approvals are obtained.
EXAMPLE 3-18. Field preparations.
[4]
Verify that the halon fire protection system is in service
for each GM Diesel room.
[5]
Ensure that the following tests have been completed on the
GM Diesel to be tested:
A. SP-EG-100 series.
B. SP-EG-1.