| DOE-SPEC-3021-97
ATTENTION:
Three complete sets of vendor documentation are usually desirable.
********************
a. Drawings showing batteries, interconnections, rack outlines, dimensions required for
mounting, weight of racks and filled cells, and description of rack finish for each battery
system
b. Cell outline including connector and battery terminal details, electrolyte levels, weight
of assembled cell, separate weights of electrolyte, plates, and jar
ATTENTION:
Add the following paragraph when seismic requirements apply.
********************
c. Seismic rack design and certification (see paragraph 3.2.4)
d. Type, catalog designation, and description of major components provided by Seller
e. Longest recommended storage time when batteries are shipped charged, and [wet]
[dry]-charged; and Seller's storage and freshening charge recommendations
f.
Field test recommendations, including performance tests
g. Test reports for factory tests, including capacity tests
Seller's
Owner's
Spec
Submittal
Review Req'd
Item
Description
Para
Date
Before Shipmnt
a.
Proposed schedule to
-
With proposal
Yes
meet delivery date(s)
b.
Preliminary dwgs with
-
With proposal
Yes
sufficient information
for Owner to proceed
with design
c.
Complete list of
-
With proposal
Yes
exceptions
] weeks
Yes
d.
Seismic certification
3.2.4
[
before shipment
e.
Sound-level data
3.4.1
[
] weeks
Yes
before shipment
f.
Recommended spare
3.6
With proposal
Yes
parts list
and shipment
g.
List of special tools
3.7
With shipment
No
26
|