| ELECTRICAL AREA PRACTICAL FACTORS CARD
NAME: _____________________________________________________________
Instructions: The trainee must perform, simulate, or observe (as required and indicated by the X's) all practical factors
listed on this card. Activities indicating a single NPPO action may not be changed: activities indicating more than one
NPPO action (perform, simulate, observe) may be satisfied by completing any one. The order of preference for the actions
shall be (1) perform, (2) simulate, (3) observe.
Upon satisfactory completion of each activity, a qualified operator shall circle the action taken, and sign (using full
signature) and date in the appropriate space.
S
P
i
O
e
m
b
r
u
s
f
l
e
o
a
r
r
t
v
m
e
e
Signature
Date
Complete Log 1-A (Section 1)
X
Start up and parallel generator to INEL loop
X
Recover from trip of the auto transfer scheme
X
Recover from loss of normal power
X
Rack out a 13.8-kV or 2400-V breaker
X
Place constant power on one UPS using output breakers
and bus tie
X
Place MCC S1A on MCC S1B
X
Manually start 400/100-kW diesel
X
Shift 125-Vdc distribution system to No. 1 UPS battery
X
Manually separate the turbine-generator from the INEL loop
X
Properly tag out electrical equipment
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
LOG READINGS - Take six sets of electrical log readings
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
No. 1
X
No. 2
X
No. 3
X
No. 4
X
No. 5
X
No. 6
X
I hereby verify that the named individual has satisfactorily completed all electrical-area practical factors and has demonstrated
the necessary abilities and maturity to perform the indicated activities.