| FUEL HANDLING AREA PRACTICAL FACTORS CARD
NAME: _____________________________________________________________
Instructions: The trainee must perform, simulate, or observe (as required and indicated by the X's) all practical factors listed on
this card. Activities indicating a single NPPO action may not be changed: activities indicating more than one NPPO action
(perform, simulate, observe) may be satisfied by completing any one. The order of preference for the actions shall be (1) perform,
(2) simulate, (3) observe.
Upon satisfactory completion of each activity, a qualified operator shall circle the action taken, and sign (using full signature) and
date in the appropriate space.
S
P
i
O
e
m
b
r
u
s
f
l
e
o
a
r
r
t
v
FUNCTIONAL LOGS
m
e
e
Signature
Date
Complete Log 1-E
X
Complete Log 1-F
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Transfer a subassembly from FMF to reactor building
XXX
Dimensionally check two subassemblies and load them into
auxiliary coffin
X
Transfer a subassembly from FUM to basket
X
Transfer a subassembly from basket to IBC
X
Transfer a subassembly from basket to FUM with reduced
argon temperature
X
Operate FH console during a restricted transfer
X
Perform unrestricted fuel handling (Sequence A)
X
Perform six round trips (12 sequences in the unrestricted
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
fuel-handling mode (4 must be performed as the FH console
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
operator):
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
No. 1
X
No. 2
X
No. 3 (FH console operator)
X
No. 4 (FH console operator)
X
No. 5 (FH console operator)
X
No. 6 (FH console operator)
X
Perform unrestricted fuel handling (Sequence B)
X
Participate in large-plug seal cleaning
X
Participate in small-plug seal cleaning
X
Set up seal heaters for unrestricted fuel handling
X
Manually operate the core-gripper elevation drive
X
Manually operate the FUM-gripper elevation drive
X
Manually operate the FUM shield
X
Manually operate the FUM port seal
X
Start up the argon cooling system
X
Perform ACS emergency-valve operation
X
Complete a purge on the IBC
X
Action required for loss of cooling to a subassembly
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
requiring cooling:
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
In IBC
X
In FUM
X
B-10
|