|
| FUEL HANDLING AREA PRACTICAL FACTORS CARD (contd)
S
P
i
O
e
m
b
r
u
s
f
l
e
o
a
r
r
t
v
m
e
e
Signature
Date
Transfer an IBC containing a subassembly to HFEF-S
X
Receive an IBC from HFEF-S
X
Transfer a subassembly to IBC when IBC port cannot be
closed
X
Participate in safety-rod thimble replacement
X
X
Participate in safety-rod replacement
X
X
Participate in control-rod and INCOT-thimble replacement
X
Participate in 180 rotation of subassembly in:
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Storage basket
XX
Reactor
X
Perform core-gripper and hold down manual force
X
Participate in locking subassembly replacement
X
X
Complete Log 7-W (N-1 nozzle pressure monitoring)
X
Complete FUM-port and fuel-transfer-port torque
measurement (Log 7-R)
X
Change spacer and key bar in auxiliary coffin
X
Manually operate IBC port
X
Decontaminate IBC
X
I hereby verify that the named individual has satisfactorily completed all fuel-handling-area practical factors and has
demonstrated the necessary abilities and maturity to perform the indicated activities.
_______________________________________________________________
Alternate Reactor Shift Supervisor
Date
B-11
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |