|
| DOE-STD-1068-94
3.4.1.4
Vendor Correspondence
This section should contain any correspondence,
inspections, and test results received from the vendor
which relate to routine or PM servicing, parts, changes to
as-built drawings, etc. Engineering support personnel
should review this information and ensure it is filed and
properly applied.
3.4.2 Maintenance History Utilization
3.4.2.1
Engineering Reviews
Equipment failures should be analyzed promptly.
Abnormal trends noted during diagnostic monitoring
should be analyzed and corrective action recommended in
a timely manner. In addition, periodic engineering
reviews of the maintenance history file should be
conducted in accordance with a schedule recommended
by the engineering support supervisor and approved by
the responsible manager. Component files should be
reviewed at least every two years. The purpose of the
review is to determine if recurring maintenance problems
or other performance trends indicate a need for corrective
maintenance. The assigned engineer should determine the
probable cause and recommend a course of action. This
may result in corrective maintenance, component
modification or replacement, a change in the preventive
or predictive maintenance schedule, or a change in a
procedure. The assigned engineer should track
performance after corrective action has been performed to
ensure deficiencies have been corrected.
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |