| DOE-EM-STD-5505-96
APPENDIX G
SAMPLE OPERATIONS ASSESSMENT REPORT
FINDING:
Four of 18 Occurrence Reports reviewed were submitted beyond the required time
limits.(References: 1, 2, 3)
DISCUSSION: Occurrence reports from 17 February 1995 to present were reviewed. The
four overdue reports were:
- RC-C-Tank Farm-1995-0015
- RC-C-Tank Farm-1995-0025
- RC-C-Tank Farm-1995-0031
- RC-C-Tank Farm-1995-0033
CONTROL OF EQUIPMENT AND SYSTEM STATUS
REFERENCES:
1. DOE 5480.19, Chapter VIII
2. CM-1-8, Section 2.0
3. CM-6-1, EP-2.2
4. IP-0842, Volume II, Section 4.8.1
5. IP-0842, Volume IV, Section 4.5
6. IP-0842, Volume IV, Section 5.7
FINDING:
Ten of 43 work packages released on 7/18/95 were not listed on the Daily Release Sheet.
(References: 1, 2, 4)
DISCUSSION: Six of these documents were reported as field work complete and 4 of the
documents were deferred or contingency work.
FINDING:
Two of three Shift Managers interviewed were not familiar with the use of the Facility Status
Binder for LCO status. (References: 1, 2, 4)
DISCUSSION: The Shift Managers interviewed were knowledgeable of the safety status
associated with the activity; however, two were not familiar with the Facility Status Binder
which documents the mode for the tanks to ensure activities are not performed outside of the
specified safety requirements.
151
|